ADU Garage Conversion in Roseville, CA: Permitted, Priced, and Built to Code
- CSLB #
- City of Roseville ADU Building Permits
- AB 2221 + SB 9 Compliant Builds
- Roseville Electric Rebate Support
Every ADU Service Roseville Renovations Provides
ADU Garage Conversion Roseville, CA
Roseville Renovations converts attached and detached garages into permitted ADU dwelling units. The scope includes: concrete slab moisture assessment, plumbing rough-in (drain, supply, and vent lines), electrical panel circuit additions, bathroom and kitchen wall framing, insulation to Title 24 Part 6 standard, drywall, tile, flooring, cabinetry, fixtures, and a separate exterior entry door. Every permit is pulled from the City of Roseville Development Services Division at 311 Vernon Street before construction begins.
Junior ADU (JADU) Conversion Roseville
Roseville Renovations builds Junior ADU (JADU) units inside existing attached garages for Roseville homeowners. The finished space tops out at 500 square feet. Roseville Renovations handles the deed restriction recording at the Placer County Recorder as part of the permit close-out. A Junior ADU (JADU) can share a bathroom with the primary home, which removes a full plumbing rough-in from the scope and reduces your construction cost.
Detached ADU Construction Roseville, CA
Roseville Renovations builds detached ADUs on your rear or side yard from the ground up. The scope includes: site survey, foundation form and pour, framing, roofing, and all utilities extended from the main home or the street. The full permit package covers building, grading, plumbing, and electrical. A finished detached ADU works as a separate rental unit, a guest house, or a permanent family residence.
ADU Electrical and Panel Upgrade Roseville
Roseville Renovations adds two to four new dedicated circuits for every ADU garage conversion: a kitchen appliance circuit, one or two GFCI receptacle circuits, and a dedicated HVAC circuit for the mini-split heat pump. If your existing home panel is at or near capacity, a panel upgrade is required before the ADU circuits can be added. Roseville Renovations checks panel load at the free estimate visit and lists the panel upgrade as a separate cost line if needed. Panel upgrades may qualify for a Roseville Electric rebate of up to $500.
ADU Kitchen and Bathroom Plumbing Rough-In Roseville
Roseville Renovations installs the full drain, waste, and vent system and all supply lines for every ADU kitchen and bathroom at the rough-in stage. A full ADU needs a complete kitchen and at minimum a three-quarter bathroom with toilet, sink, and shower. California Plumbing Code Section 710.1 governs DWV pipe sizing for all ADU fixtures. The City of Roseville building inspector reviews the rough-in before any wall is closed.
ADU Mini-Split Heat Pump Installation Roseville
Roseville Renovations installs ductless mini-split heat pumps on every ADU garage conversion in Roseville. A single-zone mini-split handles both heating and cooling without ductwork. This is the right solution for a garage that has no existing duct system. California Title 24 Part 6 also requires mechanical ventilation in habitable rooms that do not have enough operable windows. Roseville Renovations installs the indoor head unit, the outdoor compressor, the refrigerant lines, and the dedicated electrical circuit as a single scope item. The mini-split installation may qualify for a Roseville Electric rebate of up to $300.
Slab Foundation ADU Garage Conversion (Maidu and South Roseville)
Roseville Renovations includes concrete slab cutting in every ADU garage conversion estimate for Maidu (95661) and South Roseville. Garages in these neighborhoods sit on monolithic concrete slabs. Adding a bathroom requires cutting the slab to place the toilet drain rough-in and floor drain. Roseville Renovations uses a Husqvarna DM220 core drill and a diamond-blade concrete saw to make controlled cuts at the correct depth. After the City of Roseville plumbing inspection passes, we repour the slab to its original thickness and slope. The slab cut-and-recore scope is listed as a separate line in your estimate so the cost is clear before work begins.
ADU Insulation and Title 24 Part 6 Energy Compliance Roseville
Roseville Renovations installs all insulation to the 2022 California Energy Code standard before any drywall on every ADU garage conversion. California Title 24 Part 6 sets the minimum R-values: R-21 batt with a thermal break for ADU exterior walls and R-38 for ceilings. Meeting Title 24 Part 6 is a requirement for every City of Roseville building permit close-out. Roseville Renovations includes the Title 24 Part 6 compliance report in every permit package. The City of Roseville building inspector verifies insulation at the rough-in stage before the drywall crew arrives.
Complete City Approval Management
How Roseville Renovations Converts a Garage to an ADU
01
Free On-Site Feasibility Assessment
Roseville Renovations visits your property at no cost. We use a Tramex CME5 moisture meter to probe the concrete slab for moisture problems before any planning begins. We measure ceiling height and confirm it meets the California Building Code Section R305.1 minimum of 7 feet for habitable rooms. We also check your electrical panel capacity for the new ADU circuits.
02
Written Scope and ADU Type Selection
After the site visit, Roseville Renovations delivers a written scope document. It lists the ADU type, all permit types required, the project timeline, and a published cost range. You do not need to sign a contract to receive the scope. There is no obligation to proceed.
03
Permit Package Preparation
Roseville Renovations prepares your full permit package. This includes architectural drawings, structural engineering notes where needed, and a Title 24 Part 6 energy compliance report. We submit the package to the City of Roseville Development Services Division at 311 Vernon Street and track your application status.
04
Demolition and Plumbing and Electrical Rough-In
Construction starts after the permit is in hand. Roseville Renovations checks the concrete slab at demo for any drainage corrections needed before the space becomes habitable. Next, we run the plumbing drain, supply, and vent lines for the kitchen and bathroom. We also run the new electrical circuits for the ADU panel.
05
Insulation, Drywall, and Finish
California Title 24 Part 6 sets the minimum insulation R-values for ADU walls and ceilings. Roseville Renovations installs insulation to the 2022 California Energy Code standard before any drywall is installed. After the City of Roseville inspection passes, finish work begins: flooring, kitchen cabinetry, bathroom tile, fixtures, doors, and windows.
06
Final Inspection and Close-Out
Roseville Renovations schedules and attends the City of Roseville final building inspection. After the City signs off, you receive a complete permit close-out packet. This packet includes the City-stamped inspection card, all product warranties, and your waterproofing and insulation documentation.
Service Area
TOP-RATED LOCAL SERVICES ACROSS ROSEVILLE
- Blue Oaks
- Quail Glen
- Sun City
- Westpark
- Woodcreek Oaks
- Kaseberg-Kingswood
- Stanford
- Lead Hill
- Olympus Pointe
- Olympus Pointe
- Sierra Gardens
- Johnson Ranch